top of page

MBRC Footbridges

CLIENT: MBRC

DATE OF COMPLETION: March 2022

WORK SCOPE:

Multiple footbridges constructed for the MBRC ranging from 9m to 11m.

The existing structures were dismantled and removed from the site.

All bridges followed a similar design. 

bottom of page